Re-Pipe2024River Oaks, Houston TX
River Oaks Estate Re-Pipe
Whole-home PEX · 4,200 sq ft

Square Feet
4,200
Days to Complete
4
Pressure Restored
72 PSI
Access Cuts
11
The challenge
A 1960s-era River Oaks estate had original galvanized supply lines with severe corrosion causing brown water and low pressure. The homeowner needed the work done in under 5 days with minimal drywall damage.
The outcome
Completed the full PEX re-pipe in 4 days with 11 targeted access cuts — all patched before we left. Water pressure went from 28 PSI to 72 PSI. Zero callbacks at 6-month follow-up.
Start a similar project
Request a free bid and we'll get back to you within one business day.
Request a Bid832-878-8831